STATION IN KATUTURA, WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY NAMIBIA Pty (Ltd)
HENADAVA SERVICE STATION IN KATUTURA, WINDHOEK, KHOMAS REGION CONSULTANT: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PROPONENT: PUMA ENERGY
The EMP is a living document that must be prepared in detail, and regularly updated, by the Proponent as the project progress and evolve. The EMP and ECC must be communicated to the site managers. A copy of the ECC and EMP should be kept on site. All monitoring results must be reported on as indicated.
The Environmental Management Plan (EMP) is an on-site working document developed to ensure that the project is implemented in an environmentally sustainable
Calabash Products. Calabash has been developed from the ground up. All Calabash products have had input from a range of stakeholders who are actively involved in community engagement to ensure the tools are practical and relevant to the social, cultural, environmental and economic realities of the SADC region. Below is a brief summary of
To protect the environment and achieve sustainable development, all projects, plans, programmes and policies deemed to have adverse impacts on the environment require
STATION IN EROS, WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY NAMIBIA Pty (Ltd) P.O
Environmental Assessment and Environmental Management Plan for the construction and operations of the proposed fuel retail facility on Erf 8002, Windhoek: c/o Wika and Sean McBride Street, (Figure 1). The construction of the proposed development has
Detailing environmental impacts of the existing facilities, assessment of existing controls and recommendations for environmental management to ensure the project continues
MUNITENGE SERVICE STATION IN WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY NAMIBIA
STATION, WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY NAMIBIA Pty
To protect the environment and achieve sustainable development, all projects, plans, programmes and policies deemed to have adverse impacts on the environment require
To protect the environment and achieve sustainable development, all projects, plans, programmes and policies deemed to have adverse impacts on the environment require
STATION IN KATUTURA, WINDHOEK, KHOMAS REGION PREPARED BY: NAM GEO-ENVIRO SOLUTIONS P.O. BOX 3343 WINDHOEK TEL/FAX: +264(61) 402246 Email: info@geoenvirosol PREPARED FOR: PUMA ENERGY NAMIBIA Pty (Ltd)
OPERATIONS OF OSHAKATI SERVICE STATION IN WINDHOEK ENVIRONMENTAL MANAGEMENT PLAN Assessed by: Assessed for: June 2021 TABLE OF CONTENTS 1 BACKGROUND AND
With the development of the new situation of traditional energy and environmental protection, the power system is undergoing an unprecedented transformation[1]. A large number of intermittent new energy grid-connected will reduce the flexibility of the current power system production and operation, which may lead to a decline in the utilization of
1 1 TRODUCTION Puma Energy Namibia Pty (Ltd) intends to regularize the operation of existing Puma Klein Windhoek Service Station in accordance with the Environmental Management Act No. 7 of 2007, which specifies that the construction and operations of
Baker Hughes Energy Services Namibia (Pty) Ltd. 5 July 2024. [1044] See full details. Environmental Impact Assessment process for the proposed minerals prospecting and small-scale mining activities within Mining Claims (MCs) 71836 and 71837, Daweb Constituency, Hardap Region.
Detailing environmental impacts of the existing facilities, assessment of existing controls and recommendations for environmental management to ensure the project continues its
ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR THE PROPOSED NEW BULK FUEL STORAGE FACILITY IN WALVIS BAY, NAMIBIA The Environmental
– Environmental assessment of energy storage systems A. Sternberg and A. Bardow, Energy Environ. Sci., 2015, 8, 389 DOI: 10.1039/C4EE03051F To request permission to reproduce material from this article, please go to the .
To implement the carbon peaking and carbon neutrality goals, improving market mechanism to maximize the utilization of energy storage is attracting more and more attention. This paper addresses the trading strategy of independent energy storage station participating in both energy market and frequency regulation market. A restrictive coefficient of available
VIVO Energy Namibia Ltd. P.O. Box 101, Windhoek Tel: +264-61 270 1111 Fax: +264-61 230 269 Eino.Uwanga@vivoenergy . This document is for the use of VIVO Energy Namibia Ltd and AGRA Namibia only and may not be transmitted to any other party, in whole or in part, in any form without written consent permission of Matrix Consulting
Geo Pollution Technologies (Pty) Ltd was appointed by Puma Energy Namibia (Pty) Ltd (the Proponent) to prepare an environmental management plan (EMP) for the continued operations of the existing fuel retail facility, V.K. Auto Electric service station, on erf 5574, Windhoek, in the Khomas
Ocean Bunker Petroleum Services hereby submit an application for an Environmental Clearance Certificate (ECC) for the proposed construction of a Diesel
1 INTRODUCTION True-Gem Investment CC requested Geo Pollution Technologies (GPT) to update their Environmental Management Plan (EMP) for the existing Goreangab Waterfront Service Station, Windhoek. The facility is situated on erf 77 GG off
TITLE: Environmental Assessment for the Upgrading and Renovations for the Fleet Management Fuel Station for City of Windhoek, Khomas Region, Namibia AUTHORS: Ms. Ruth Nuujoma Ms. Maria Shimhanda CLIENT: Om''kumoh ConsultingWindhoek)
The Environmental Assessment (EA) policy was developed and refined through a lengthy process of cross sectoral and multi-disciplinary consultation and negotiation.
The overall monitoring and evaluation findings of the operations of Henadava service station are in accordance with the SABS/SANS and Ministry of Mines and Energy standards and
© CopyRight 2002-2024, BSNERGY, Inc.All Rights Reserved. sitemap